Case Study: From Design Support to Pilot Production
Overseas hardware startup Client X needed to launch a consumer electronics wearable, with a tight 8-week timeline and zero room for tooling errors. Their core challenge: complex assembly design, strict appearance requirements, and a 300pcs pilot run target.
Our Shenzhen team stepped in with full DFM analysis, prototype validation, rapid tooling fabrication, and low-volume injection molding support. We identified 3 critical design flaws pre-tooling, cut their lead time by 2 weeks, and delivered 300 production-grade parts on schedule, with zero tooling rework.
We turned their concept into market-ready parts, faster.
Want to see more case studies? Visit our Case Studies collection via the menu.